Ferrari Mondial rear detail with mirror-finish paint

Museum & Concours · From $21,500

The pinnacle of detailing. 175+ hours per vehicle.

A preservation-first process built for concours competition, museum exhibition, and investment-grade collections. Disassembly, wet sanding, texture leveling — and everything that follows.

175+ hours AMMO Masterclass processBy application only

Preservation, not just presentation

Built for vehicles where the paint is the artifact.

Museum detailing is a different discipline than a fast turnaround. Every step is documented, non-invasive where possible, and engineered around long-term preservation of the original finish — whether that finish is a modern hypercar clearcoat or a decades-old single-stage lacquer.

Scope of work

Everything included. No add-ons.

At this tier, wheel removal, wet sanding, engine bay work and headlight restoration are baseline — not upgrades.

James polishing a supercar
  • Full disassembly of accessible panels, badges & trim
  • Wet sanding and texture leveling of original paint
  • 3-stage paint correction — 95% swirl, scratch and etching removal
  • Wheel removal detailing (fronts, backs, barrels, calipers)
  • Engine bay & headlight restoration included
  • Interior: steam cleaning, leather care, headliner spot treatment
  • Trunk, door jambs, hinges and hose areas hand-cleaned
  • 4-year ceramic coating on painted surfaces
Ferrari Mondial side profile with mirror finish

Who it's for

By application only.

Bookings are limited each year. Vehicles are accepted based on significance, condition, and fit with the preservation approach.

  • Vehicles exceeding ~$750k in value or historical significance
  • Concours d'Elegance & marque-invitation shows
  • Institutional & private-museum collections
  • Investment-grade preservation for long-term storage

Request consideration

Tell James about the car.

Send year, make, model, provenance and current condition. James personally reviews every request. Concours-timeline projects should be discussed at least 8–12 weeks in advance.